• Welcome to Nibley City
  • Nibley City
  • image
  • Nibley City Gardens
  • Pavilion
  • Playland
  • Swings
Previous Next

Nibley is currently using the ICC 2015 Codes as amended by the state of Utah

 

Building permit application:   free-house-construction-plans-ORIGINAL

Build Permit Packet Application: For new building construction

Building Permit Application

Accessory Building Application

Fence Permit

 

General requirements of paperwork to be submitted with application:

-        Two copies of engineered stamped,(if applicable) to-scale plans; (Electronic plans and application can be emailed to austen@nibleycity.com)

-        To-scale plot plan showing setbacks and location of project/building as well as intended location of utility services

-        Engineering calculations, manual J,S,D, and res-check paperwork

-        SWPPP Compliance( if necessary)

Timeline:

-        Please allow up to two weeks from the date of submittal for processing. You will be contacted by phone/email with an exact total amount due and when you can pick up and pay for your building permit.

home-under-construction-rishichhibberRequired inspections:

Inspections will vary depending on the project. A list of required inspections will be included upon issuance of building permit.

 

 

Fees:

Building deposit:

A building deposit of $1000.00 will be charged with other fees. The deposit is refundable at the end of the project provided all inspections have been completed, job site has been kept free from garbage, porti-jons have been on site, and city sidewalks/curbs are not cracked, etc. Any violations will be deducted from deposit.

Building permit fee and plan check fee:

The building permit fee and plans check fee are based on the valuation of the project on the building permit application, be sure to provide an estimated valuation when filling out an application.

Storm water fee:              $100.00

Water meter: (cost of meter)

1” water meter:  $700.00

2” water meter: $1500.00

3” water meter: $2994.00

4” water meter: $3942.00

 

Water impact fee:

1” water meter: $1,950.00

2” water meter: $6,241.00
3” water meter: $11,701.00

4” water meter: $23,403.00

Sanitary Sewer impact fee: (based on size connection of water service)

1” water meter:                $1,725.00

2” water meter:                $5,520.00

3” water meter:                $10,349.00

4” water meter:                $20,698.00

Road impact fee:

Single family detached house:                     $467.00 per unit

Apartment:                                                      $324.00 per unit

Condominium/Townhouse:                         $286.00 per unit

Retail store:                                                     $2,803.00 per 1,000 square feet

Office:                                                               $1,107.00 per 1,000 square feet

Light Industrial:                                               $341.00 per 1,000 square feet

Warehousing:                                                  $242.00 per 1,000 square feet

Education:                                                        $618.00 per 1,000 square feet

Hotel:                                                                $436.00 per room

Food Services (fast food)                              $4,393.00 per 1,000 square feet

Gas station with Convenience store:         $$7,950.00 per fueling station

Church:                                                             $445 per 1,000 square feet

Park Impact fee:

$4500.00 per single family unit

$4500.00 per multi family unit

 

 

Other Links:

      Nibley Common Plan SWPPP Template

     State of Utah Notice of Intent (NOI)

Open Bids:
2019 Road Maintenance
2019 Road Maintenance Map 
2019 Road Maintenance Addendum #1
 
Design Standards and Specifications:
 
     Nibley City Design and Construction Standards and Specifications (updated 19 May 2016)
 
     Cache Valley Storm Water Design Standards
 
     Nibley City Ordinances

Public Works Director: Justin Maughan - 770-0727

Public Works Inspector: Steve Eliason - 890-0082

Building Inspector:  Austen Powell - 979-6488

Water and Sewer Department: Justin Pope - 994-0663

     Nibley City 2018 Consumer Confidence Report

    Nibley City 2017 Consumer Confidence Report

    Nibley City Sanitary Sewer Management Plan (SSMP)

Parks Department: Rod Elwood - 994-0670

Streets and Stormwater Department: Steve Eliason - 890-0082

      Nibley Stormwater Managment Plan   

      Nibley Construction General Permit SWPPP Template

      Nibley Common Plan SWPPP Template

     State of Utah Notice of Intent (NOI)

 

 

Contact - Stephen Nelson

City Planner

435 752-0431

stephen@nibleycity.com

 

Contact - Shaun Dustin

Mayor

435-752-0431 Office

shaun@nibleycity.com

English Spanish

Latest Events

Thu Jul 18 @ 6:00PM - 09:00PM
Planning and Zoning Meeting
Sat Jul 20 @12:00AM
Utility Bill Due Date
Mon Jul 22 @ 6:00PM - 07:00PM
Justice Court
Thu Jul 25 @ 6:30PM -
City Council Meeting
Mon Jul 29 @ 6:00PM - 07:00PM
Justice Court
Thu Aug 01 @ 6:00PM - 09:00PM
Planning and Zoning Meeting
Mon Aug 05 @ 6:00PM - 07:00PM
Justice Court
Thu Aug 08 @ 6:30PM -
City Council Meeting
Mon Aug 12 @ 6:00PM - 07:00PM
Justice Court
Thu Aug 15 @ 6:00PM - 09:00PM
Planning and Zoning Meeting

Mission Statement

The mission of Nibley City is to make life better for its citizens by fostering community cooperation so residents, businesses, and government work together to develop the City in harmony with its natural environment, historical surroundings, and in accordance with the values and vision of the community as set forth in the General Plan. The City will provide fiscally sound municipal services for a safe, attractive, creative, and viable community.